Completed Maintenance Items |
| 28b |
43 Lexington Rd. |
The wood frame around the front door is rotten this was noticed when
the owner attempted to install a new storm door.
|
8/2003 |
repaired Dec 2003 |
| 10 |
Electrical power panels
All electrical power panels will be
inspected. Those that fail the inspection will be repaired or replaced
|
The first electrical panels (electric
meters) has been installed (9/10 Village Green). The
electrician has inspected most panels. Most passed inspection. Will be
reviewed periodically.
51-52 meter panels replaced 9/03.
43 Lexington scheduled to be replaced 12/03.
|
| 15 |
1 Meetinghouse |
Large pot hole in driveway |
4/22 |
New Driveway - COMPLETED |
| 5 |
Corner at Meetinghouse/Bunker Hill |
Light Standard loose, broken below ground
|
8/1/02 |
COMPLETED
|
| 22 |
9 Village Green |
Water leaking into attic |
6/23/03 |
COMPLETED |
| 13 |
45 Lexington |
Water in basement |
3/31/03 |
COMPLETED |
| 14 |
Mail Building |
Lettering still needs to be installed on
the new awning at the mailbox area.
Corrective action regarding the mounted to the building is also
needed. |
1/03 |
COMPLETED
|
| 8 |
17 Lexington Rd |
water leak, siding requires caulking |
|
COMPLETED |
| 17 |
11MH
|
bees nest behind front light between the brick facade and the light. Light will need to come down
to kill the bees. |
5/21/03 |
COMPLETED |
| 27 |
5 Meetinghouse |
During the recent rains, noticed a leak in front bedroom.
Specifically, small stain where the ceiling meets the wall, also
horizontal water mark on the front wall, running between the two
windows, half-way up.
|
8/7/03 |
COMPLETED
|
| 26 |
8 Meetinghouse |
Water stains in the master bedroom ceiling
|
8/6/03 |
COMPLETED |
| 25 |
25 Lexington |
Leaking around the vent fan in the full bath on the second
floor.
|
8/2/03 |
COMPLETED |
| 28 |
43 Lex |
Water in the basement, this is caused by a crack in the foundation and
the amount of rain.
|
8/2003 |
COMPLETED - Crack in foundation repaired |
| |
13 Lex |
The carpet in the basement bedroom is wet. No viewable crack in the
foundation but the ground at the back of the building is mud
|
8/2003 |
COMPLETED |
| 7 |
Corner Lexington/Bunker Hill |
STOP sign needs replacing |
8/1/02 |
COMPLETED |
| 14 |
Mail Building |
Lighting situation |
1/03 |
COMPLETED
|
| |
3 Concord |
Trim around octagon window needs fixing
|
|
COMPLETED |
| 1 |
25 Lexington |
Trim around octagon window missing |
2/10/03 |
COMPLETED |
| 19 |
15-18 Lexington |
No water is flowing from the inside rear
gutter downspouts on 15-18 Lexington. The water is flowing over the end
of the gutter onto the decks of 15-16 (esp 16).
rear gutter - Water is flowing between the gutter and
building at the end near the bathroom of 18 Lex.
|
6/14/03 |
Completed 7/15
|
| 6 |
Many locations |
Faded NO PARKING signs |
6/1/02 |
Completed 5/30/03 |
| 16 |
All buildings |
downspout extensions on the new front
gutters with splash plates to prevent erosion |
|
Completed 5/03/03 |
| 11 |
1 Concord |
Guard rail is broken |
3/15/03 |
Completed 5/19/03 |
| 3 |
3 Lexington |
Deck/building flashing required and gutter
repair |
1/1/03 |
Completed 4/5/03 |
| 12 |
58 Lexington |
Missing roof vent |
3/20/03 |
Completed 4/1/03 |